Skip to main content
2381 W. 1200 N. Clinton, UT 84015  |  801-776-3601

RC Parkwest

RC Parkwest Phase 1 is a residential development in Syracuse, UT consisting of 40 single-family building lots and 9 multi-family townhome sites. Thurgood Excavating installed 18,500 linear feet of storm drain, land drain, sewer, culinary, and secondary pipe ranging from 8"-24". In addition to underground utilities, our contract included prepping and grading the site for asphalt.

RC Parkwest Ground Preparation

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

RC Parkwest

Ready to start your project?
Connect with Thurgood Excavating!