SR-193 Extension
Thurgood Excavating was a subcontractor on the SR 193 extension project in Davis County. Our contract included the installation of 7,575 linear feet of 18"-36" RCP and 1,280 linear feet of 18" ADS along with 49 catch basins and manholes